Drywall · Tape · Spackle · Skim-Coat

Seamless walls & ceilings—ready for a perfect paint finish.

We use USG Sheetrock® fire-rated gypsum boards, Paper-Faced Metal® corners, and dust-control joint compound for cleaner sanding.
Our in-house crew handles hanging, taping, spackle & sanding—no sub crews. That means tighter scheduling and lower costs.
Choose Level 4 (standard paint) or Level 5 (full skim) for ultra-smooth matte finishes—perfect under dark, low-sheen colors.
Basement demo showing moldy drywall removed and studs exposed

From Demo to Rebuild

What looked like a total loss—black mold, swollen panels, warped trim—became a clean, paint-ready room in under a week.

From Demo to Smooth in 4 Days

Day 1 – Demo & Hang

Remove damaged board, install new panels with hidden screws.

Day 2 – Tape & Corners

Embed joint tape, set metal corners, first-coat spackle.

Day 3 – Sand & Skim

Dust-free sanding; optional full skim for Level 5 finish.

Day 4 – Prime & Inspect

High-build primer reveals imperfections; touch-ups before paint.

Drywall FAQ

Can you match my existing orange-peel texture?

Yes, we have adjustable hopper guns and multiple tip sizes to replicate common textures.

Is skim-coating worth it?

For matte or low-sheen paints, Level 5 skim ensures light doesn’t reveal seams. Gloss finishes require it.

Do you handle insulation or framing?

Minor framing & fire-blocking are included. We can coordinate blown-in insulation when needed.

Need Smooth Walls Fast?

Text a photo of your damage for a same-day quote.

(845) 200-6966